On December 2, 2022, the reinforced high-voltage interconnection between Avelin in France and Avelgem in Belgium was officially inaugurated. A joint project by French grid operator RTE and Belgian grid operator Elia, this upgraded 380kV line doubles the electricity transmission capacity between France and Belgium from 3 to 6GW. A big step for both countries in addressing the need for more capacity to supply and exchange electricity, including from renewable energy production. The key to the interconnection upgrade is HTLS overhead conductors, which Lamifil produced and supplied for the Belgian side of the line.
Addressing Future Needs of National and European Grids
Reinforcing the interconnection between France and Belgium is vital and supports several objectives. First, by drastically increasing exchange capacity, the line plays a key role in securing electricity supply in Belgium, France, and Europe. Moreover, a more powerful connection enables smoother, growing electricity exchange between local regions, the French and Belgian national grids, and the wider European network. Finally, bolstering this interconnection is vital to support the transition to and integration of renewable energy, especially wind power.
Advanced HTLS Overhead Conductors Provide the Key
The link between Avelin and Avelgem has existed since 1974, covering 20 km on the French side and 23 km on the Belgian side. The key interconnection upgrade involved reconductoring, or replacing, the double-circuit power line’s conductors with new, advanced HTLS (High Temperature, Low Sag) conductors. These high-performance conductors, featuring a composite core, reduce sag while doubling transmission capacity. Lamifil produced and delivered 400km of ACCC®-Z Antwerp ULS Conductor.
“We are very pleased to have been part of this project, whose importance cannot be underestimated,” says Filip Goris, CEO of Lamifil. “Replacing old overhead conductors with advanced high-capacity overhead conductors is probably the fastest and most cost-effective way to strongly increase the capacity and robustness of grids all over the world while at the same time reducing energy losses and CO2 emissions.”
The Avelin-Avelgem interconnection upgrade is one of many projects being completed to strengthen the European grid. Lamifil has been a partner supplying many thousands of km of efficient conductors for several of these upgrades, including the vital Avelgem-Gavrelle 400kV line in Northern France, the Brabo 380kV project around the Port of Antwerp and the “Beter Benutten Bestaande 380kV net” (Making Better Use of the Existing 380kV grid) project to shore up the entire Dutch high-voltage backbone.
Original announcement: Lamifil
Image: Courtesy of Lamifil
Explore more about Lamifil
About this Advertorial Feature
This article has been published as an Advertorial Feature as part of Cable Technology News’ annual Industry Partner Programme.
Advertorial Features are professionally presented and published in accordance with our Editorial & Advertising Policy. Publication does not constitute an endorsement of any company, product or service.
Interested in raising your organisation’s profile across the global cable industry?
Explore our annual industry partnerships here.