Leading cable manufacturer reduces wasted time and expense with all-in-one bespoke solution

Moving heavy and awkward loads from an inside production area to outside containers ready for shipping was proving a challenge for a world-leading manufacturer of cables. Reliance on forklift trucks meant that valuable loads were not secure when being lifted and transported – putting staff at risk through lack of visibility and the danger of overbalancing. Meanwhile, ensuring the necessary clearance when using overhead cranes was resulting in wasted time and expense.

MasterMover PS3000+

A MasterMover PS3000+ and bespoke trolley now allows for precision movement when transporting reels of cables from production to shipping containers, meaning that a single operator can push, pull and steer the load using a remote control for total, all-round visibility.

The trolley, which was designed by our Special Projects’ Team, is capable of lifting, loading and securely transporting different size reels.

It’s a custom, all-in-one solution that has reduced the reliance on expensive forklift trucks and overhead cranes. Today, operations run more smoothly and efficiently, thanks to a bespoke design that offers complete flexibility for now and the future.

James Jones, Special Projects’ Director, said: “The PS3000+ is our most powerful electric tug yet and allows a single operator to move loads of up to 30,000 kg. Our Special Projects’ Team were also called on to design a bespoke trolley – showing that, whatever the challenge, we have the expertise to create a precision engineered solution tailored to our customers’ needs.”